|
Title: |
DB Schenker Cargo BR 185 operations |
Description: |
DB TRAXX units also provide special local services as shown here with 185 095, where the Red Arrow RBe 2/4 of Oensingen Balsthal Bahn is pulled empty over the Gotthard route. The BR 185 has the operational allowance up to a level of 1200 m, just enough to master the highest point in Gotthard tunnel of 1151 m. |
Photo Date: |
9/11/2011 Upload Date: 12/20/2012 9:24:01 AM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
TRAXX F140AC1(UNKNOWN) |
Views: |
352 Comments: 0 |
|
|
|
Title: |
18437 - SBB Swiss Federal Railways |
Description: |
Three days after the blasting a first excavator was brought to the Gurtnellen rock blasting site to clear the track bed. |
Photo Date: |
6/21/2012 Upload Date: 8/8/2012 7:21:17 AM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
SBB BM4/4(UNKNOWN) |
Views: |
515 Comments: 0 |
|
|
|
Title: |
18437 - SBB Swiss Federal Railways |
Description: |
The Bm 4/4 awaits permission to proceed to the rock site near Gurtnellen with a track gang. |
Photo Date: |
6/21/2012 Upload Date: 8/8/2012 7:21:37 AM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
SBB BM4/4(UNKNOWN) |
Views: |
518 Comments: 0 |
|
|
|
Title: |
425 173 - BLS Cargo AG / Switzerland |
Description: |
Pusher loco Re 425 on the way back to Erstfeld after helping a freight consist over the Gotthard summit. |
Photo Date: |
8/28/2015 Upload Date: 12/14/2015 12:11:45 PM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
BLS 425(UNKNOWN) |
Views: |
156 Comments: 1 |
|
|
|
Title: |
186 901 - Crossrail, Switzerland |
Description: |
In less than a year, you want be able to see this anymore. In June 2016 first the freight train uses the new basic Gotthard tunnel with a length of 57 km / 35 miles. Later the passenger trains are going to use it too. The two Crossrail are using the "wrong" track side (Switzerland uses the left side) as a stalled freight train blocks the left track due to a broken weel on one of the Re 4/4. |
Photo Date: |
8/28/2015 Upload Date: 9/17/2015 5:13:46 PM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
XRAIL 186(UNKNOWN) |
Views: |
544 Comments: 0 |
|
|
|
Title: |
186 901 - Crossrail AG, Switzerland |
Description: |
An empty train from Basel to Chiasso taking up the Gotthard north ramp. |
Photo Date: |
8/28/2015 Upload Date: 11/15/2015 2:56:21 PM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
CX 186(UNKNOWN) |
Views: |
121 Comments: 0 |
|
|
|
Title: |
425 194 - BLS Cargo AG / Switzerland |
Description: |
Two Re 425 starting out of Erstfeld with a steel consist to approach the Gotthard summit and then down to the Italian border at Chiasso. |
Photo Date: |
8/28/2015 Upload Date: 12/14/2015 12:11:24 PM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
BLS 425(UNKNOWN) |
Views: |
173 Comments: 1 |
|
|
|
Title: |
194 - BLS Cargo, Switzerland |
Description: |
In less than a year, you want be able to see this anymore. In June 2016 first the freight train uses the new basic Gotthard tunnel with a length of 57 km / 35 miles. Later the passenger trains are going to use it too. The BLS with a steel train heading for Italy. |
Photo Date: |
8/28/2015 Upload Date: 9/17/2015 5:13:33 PM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
BLS RE425(UNKNOWN) |
Views: |
973 Comments: 0 |
|
|
|
Title: |
503 - SBB, Switzerland |
Description: |
In less than a year, you want be able to see this anymore. In June 2016 first the freight train uses the new basic Gotthard tunnel with a length of 57 km / 35 miles. Later the passenger trains are going to use it too. |
Photo Date: |
8/28/2015 Upload Date: 9/17/2015 5:14:12 PM |
Location: |
Silenen, CH |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
SBB 503(UNKNOWN) |
Views: |
190 Comments: 0 |
|
|
|