This is where the rail is loaded into the plant to be welded into the required lengths. |
Date:
9/13/2009 |
Location:
Atlanta, GA Map  |
Views:
364 |
Collection Of:

Mick Nussbaum |
|
Author: Mick Nussbaum
|
 |
Picture Categories: |
This picture is part of album: Atlanta 2009 |