The new storage track has been pulled to a position parallel with the existing track. The new track has only gauge ties at this time and is awaiting ballast and final installation of cross ties. |
Date:
4/4/2012 |
Location:
Woodland, GA Map  |
Views:
180 |
Collection Of:

Bernie Feltman |
|
Author: Bernie Feltman
|
 |
Picture Categories: Track |
This picture is part of album: CSX roster/still photos |