After passing under the Camp Meeting Avenue Bridge, technician starts the hydraulic lift generator to slowly shift the load back to its "original" position. 0958 hours. |
Date:
7/22/2012 |
Location:
Skillman, NJ Map  |
Views:
296 |
Collection Of:

Kim Piersol |
Rolling Stock: |
Author: Kim Piersol
|
 |
Picture Categories: |
This picture is part of album: Air Products 100th Heat Exchanger Move |