Left side view at Seville Material Transfer on the Providence & Worcester Railroad at Community Ave Ext in Plainfield, CT. Built 4/1975, painted 6/1995 by B.R.S. Mar. Marked 'AAR RULE 88B.2 INSP DONE 3/99 DUE 3/2009 GAIN 177' and 'CALCIUM CHLORIDE'. 5250 cu ft cap. Length 58' 4". While OCCX 5172 waits to unload calcium chloride a trailer truck in the left background is waiting to be loaded with asphalt shingles. |
Date:
11/4/2015 |
Location:
Plainfield, CT Map  |
Views:
30 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
a.jpg) |
Picture Categories: Scenic,RollingStock |
This picture is part of album: OCCX equipment in CT |