Class C-9 (CR-9) wagons entered service between 1970 and 1972 and are designed to transport manganese ore. Some were converted from Class C-1, C-2 and C-8 iron ore wagons in 1986 by raisijg the sides, while others were built full size. The type 1 wagons have rounded bulkhead braces and had their sides raised by about 600mm.Number range 60 124 008 to 60 156 945, Length between couplers 9.834m, Length over headstocks 8.856m, Lengtu between bogie pivot centres 6.096m, Height 2.689m, Width 2.670m, Tare (average) 16,300kg, Load 63,000kg, Capacity 35.6m3. |